Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/greenwoodassociates.co.nz/httpdocs/wp-includes/functions.php on line 6131
Manufacturing Facilities – Māngere, Auckland – Greenwood Associates Landscape Architects
loader image

Manufacturing Facilities – Māngere, Auckland

Our Work

Manufacturing Facilities – Māngere, Auckland

We designed ecological restoration planting to provide screening and buffering for manufacturing facilities. Our services included visual simulation imagery and a visual assessment report for resource consent to achieve resource consent for the large scale 7 lot development beside an SEA, ONF zone.

This project in collaboration with Gaze Commercial and Envivo involved the design of ecological restoration planting to provide screening and buffering for a large manufacturing facilities in Mangere. Greenwood Associates provided landscape planting plans, visual simulation imagery and a visual assessment report for resource consent for the entire industrial zone including 7 large scale industrial suites.

Manufacturing Facilities – Māngere, Auckland

Scroll to top